Fully Permitted Industrial Complex
7,815 m² Total Area
3 Buildings. Construction Permits obtained for all stages. 1.73 Ha land plot.
Utility Core
High capacity infrastructure
Electricity
150 kW
expansion to 1,000 kW confirmed
Gas Supply
60 - 350 m³/h
high pressure
Industrial Floor
5 t/m²
anti-dust, heavy load
Ceiling Height
7.20 m
crane consoles installed
Total Land
1.73 Ha
fully permitted
Water Supply
Centralized
+ Sewage
All construction stages confirmed by Izhevsk Administration permits
Technopark status within 6 months (0% property tax)
Photo Gallery
Ready-to-use production spaces
Economic Shield
Technopark Benefits
Property Tax
0%
Payroll Taxes
Reduced
Construction Subsidy
from 5,000 m²
Ministry Support
Direct
Infrastructure & Units
3 Buildings. Total potential 7,815 m²
Phase 1
Production
Phase 2
Industrial
Phase 3
R&D Center
Sergey Platonov
Owner & Developer
"All construction stages are confirmed by permits from the Izhevsk Administration. We build legally and responsibly."
Purchase Roadmap
Request
Get technical dossier
Negotiate
Discuss terms
Visit
Site inspection
Deal
Sign contract
Launch
Start production